Back to projects

Parson Street Bridge Steel Pre-fabrication

Parson Street Under Bridge

iFix Reinforcements have completed the steel fixing pre-fabrication works on this challenging project for Kier.  This project consisted of 4 x 18m long by 2.75m diameter Caissons.  Each individual caisson had to be prefabricated at Express Reinforcements Neath then delivered to Kier in two section for them to place as required on site.

iFix Reinforcements were responsible for completing the steel fixing pre-fabrication of the four structures. Each structure weighed 15 Tonnes and the four structures were required during a four week program.

Please taker a look at the photo’s that depict how this challenging project was completed



Express Reinforcements Ltd

Parson Street Under Bridge



56T

Back to projects